Projects

We take pride in specializing in excavation and concrete work and have completed hundreds of projects throughout New York State.

  • Service Category:
  • All Services
  • Civil / Site Work
  • Concrete Work
  • Boring
  • Water Main Installation
  • Caisson Drilling
  • Gardenville Project

    Civil / Site Work

    Project was based in West Seneca, NY. It is an expansion project at the existing National Grid substation. Our scope of work included preparing the site expansion area, installing 288 concrete structures including drilled pier foundations and equipment pads, installing ground grid and duct bank throughout new area, demo and remove existing structures, installing stone and compacting in levels to achieve desired compaction. Final yard stone installed along with adding wetland mitigation ponds.


    Learn Moreabout Gardenville Project
  • Schaghticoke Substation Phase I

    Caisson Drilling

    Project was based in Schaghticoke, NY. Project consisted of providing and assembling rebar, drilling, placing temporary casings, providing and installing concrete, and installing anchor bolts (provided by others) for 80 foundations. This project is a National Grid new substation.


    Learn Moreabout Schaghticoke Substation Phase I

    Schaghticoke Substation Phase I

    Caisson Drilling

    Project was based in Schaghticoke, NY. Project consisted of providing and assembling rebar, drilling, placing temporary casings, providing and installing concrete, and installing anchor bolts (provided by others) for 80 foundations. This project is a National Grid new substation.


    Learn Moreabout Schaghticoke Substation Phase I
  • Willard Drug Treatment Center

    Boring

    Project consisted of excavating for new electrical duct bank, installing new electrical manholes and the complete site restoration once completed throughout facility. A portion of the new duct bank was to be run beneath the perimeter fence resulting in underground boring in order to maintain security.


    Learn Moreabout Willard Drug Treatment Center
  • Albion Correctional Facility

    Water Main Installation

    Project consisted of replacing approximately 5000 liner feet of ductile iron water main throughout the facility along with the required valves, backflow preventers and hydrants. Additional items completed included site clearing, site restoration, concrete sidewalk and asphalt restoration, installing precast concrete vaults and steel bollards.


    Learn Moreabout Albion Correctional Facility

    Albion Correctional Facility

    Water Main Installation

    Project consisted of replacing approximately 5000 liner feet of ductile iron water main throughout the facility along with the required valves, backflow preventers and hydrants. Additional items completed included site clearing, site restoration, concrete sidewalk and asphalt restoration, installing precast concrete vaults and steel bollards.


    Learn Moreabout Albion Correctional Facility
  • Five Mile Station

    Civil / Site Work

    Project was based in Humphrey, NY. This was a new build substation for National Grid. Work consisted of stripping the site and using a cut/fill of more than 6 feet, installing nearly 300 drilled pier foundations, oil containment system, ground grid, cable trench, final yard stone and all site restoration of project while maintaining compliance with the mandates of Article 7.


    Learn Moreabout Five Mile Station
  • Hogan Road Substation

    Concrete Work

    Project was located in Fairport, NY.  Consisted of removing and replacing an existing switchgear pad, installing 8 pier foundations, installing large concrete pad for 3 switchgear assemblies, concrete steps and sidewalk.  All concrete and rebar was furnished and installed by us in addition to site preparation and final stoning.


    Learn Moreabout Hogan Road Substation

    Hogan Road Substation

    Concrete Work

    Project was located in Fairport, NY.  Consisted of removing and replacing an existing switchgear pad, installing 8 pier foundations, installing large concrete pad for 3 switchgear assemblies, concrete steps and sidewalk.  All concrete and rebar was furnished and installed by us in addition to site preparation and final stoning.


    Learn Moreabout Hogan Road Substation
  • Laona Switchyard Project

    Civil / Site Work

    This project was based in Fredonia NY and was a greenfield project.  Our work involved existing site cut/fill, installation of 76 drilled pier cassions, installation of 750 ft of cable trench, installation of 7000 LF of ground grid, installation of all site and perimeter drainage, final yard stone and perimeter grading.  This project was completed in full compliance with Article 7.


    Learn Moreabout Laona Switchyard Project
  • Gardenville Project

    Civil / Site Work

    Project was based in West Seneca, NY. It is an expansion project at the existing National Grid substation. Our scope of work included preparing the site expansion area, installing 288 concrete structures including drilled pier foundations and equipment pads, installing ground grid and duct bank throughout new area, demo and remove existing structures, installing stone and compacting in levels to achieve desired compaction. Final yard stone installed along with adding wetland mitigation ponds.


    Learn Moreabout Gardenville Project
  • Five Mile Station

    Civil / Site Work

    Project was based in Humphrey, NY. This was a new build substation for National Grid. Work consisted of stripping the site and using a cut/fill of more than 6 feet, installing nearly 300 drilled pier foundations, oil containment system, ground grid, cable trench, final yard stone and all site restoration of project while maintaining compliance with the mandates of Article 7.


    Learn Moreabout Five Mile Station
  • Laona Switchyard Project

    Civil / Site Work

    This project was based in Fredonia NY and was a greenfield project.  Our work involved existing site cut/fill, installation of 76 drilled pier cassions, installation of 750 ft of cable trench, installation of 7000 LF of ground grid, installation of all site and perimeter drainage, final yard stone and perimeter grading.  This project was completed in full compliance with Article 7.


    Learn Moreabout Laona Switchyard Project
  • Hogan Road Substation

    Concrete Work

    Project was located in Fairport, NY.  Consisted of removing and replacing an existing switchgear pad, installing 8 pier foundations, installing large concrete pad for 3 switchgear assemblies, concrete steps and sidewalk.  All concrete and rebar was furnished and installed by us in addition to site preparation and final stoning.


    Learn Moreabout Hogan Road Substation

    Hogan Road Substation

    Concrete Work

    Project was located in Fairport, NY.  Consisted of removing and replacing an existing switchgear pad, installing 8 pier foundations, installing large concrete pad for 3 switchgear assemblies, concrete steps and sidewalk.  All concrete and rebar was furnished and installed by us in addition to site preparation and final stoning.


    Learn Moreabout Hogan Road Substation
  • Willard Drug Treatment Center

    Boring

    Project consisted of excavating for new electrical duct bank, installing new electrical manholes and the complete site restoration once completed throughout facility. A portion of the new duct bank was to be run beneath the perimeter fence resulting in underground boring in order to maintain security.


    Learn Moreabout Willard Drug Treatment Center
  • Albion Correctional Facility

    Water Main Installation

    Project consisted of replacing approximately 5000 liner feet of ductile iron water main throughout the facility along with the required valves, backflow preventers and hydrants. Additional items completed included site clearing, site restoration, concrete sidewalk and asphalt restoration, installing precast concrete vaults and steel bollards.


    Learn Moreabout Albion Correctional Facility

    Albion Correctional Facility

    Water Main Installation

    Project consisted of replacing approximately 5000 liner feet of ductile iron water main throughout the facility along with the required valves, backflow preventers and hydrants. Additional items completed included site clearing, site restoration, concrete sidewalk and asphalt restoration, installing precast concrete vaults and steel bollards.


    Learn Moreabout Albion Correctional Facility
  • Schaghticoke Substation Phase I

    Caisson Drilling

    Project was based in Schaghticoke, NY. Project consisted of providing and assembling rebar, drilling, placing temporary casings, providing and installing concrete, and installing anchor bolts (provided by others) for 80 foundations. This project is a National Grid new substation.


    Learn Moreabout Schaghticoke Substation Phase I

    Schaghticoke Substation Phase I

    Caisson Drilling

    Project was based in Schaghticoke, NY. Project consisted of providing and assembling rebar, drilling, placing temporary casings, providing and installing concrete, and installing anchor bolts (provided by others) for 80 foundations. This project is a National Grid new substation.


    Learn Moreabout Schaghticoke Substation Phase I